Choose one that fits snugly into the gap.
Gap between wall and roof.
It s a simple gable roof with vents at either end and a ridge vent.
The flashing that covers the joint space between the wall above and the roof below is called counter flashing.
My issue since not on contract and i did not check life lesson.
I recently had roof replaced and did not have drip edge installed.
And i was advised that that gap should be protected by a home inspector.
What are some solutions to cover the gap between the roof deck and the fascia board.
You could instead apply this internally.
I have gutters all the way around shingles overhang 1 1 5 get good flow to gutters.
Now wait a minute.
But where the wall sheathing meets the roof sheathing there is a gap of approximately 1 8 of an inch.
Usually there is a piece of metal flashing that is layered into the roofing plies and turned vertically up the wall.
Measure the length of the gap and cut a piece of foam backer rod to match the length.
The house does not have an overhang.
In both headwall and sidewall conditions unless the exterior wall is brick you should see a gap of at least 1 inches between the bottom of the exterior wall covering material and the top of the roof covering material.
Slowly move down the joint to apply a steady bead of caulk into.
The backer rod is available in a variety of thicknesses.
The royal society for the protection of birds encourage builders to make provision so that critters can enter your roof to nest.
If you meant an eave gap under an entirely new roof between the top of the wall and the underside of the roof that might well be especially if between the rafters or truss rafter tails your eave ventilation gap which for a ventilated unheated unair conditioned attic provides ventilation air to control heat and moisure buildup.
You ll often see exterior wall coverings installed right down on top of the shingles.